Prepainted Steel Coil is based on galvanized steel coil and Aluminized Zinc coated steel coil. After surface pretreatment (degreasing and chemical treatment), they are coated with one or more layers of liquid paints of different colors by roller coating. The coil obtained after baking and cooling. Lightweight, beautiful and good corrosion resistance.
Specification: |
Width |
600-1500mm |
Thickness |
0.12 mm-1.20mm |
Top Coated Thickness |
15μm -25μm |
Back Coated Thickness |
5μm -20μm |
Coated Material |
PE,SMP,HDP,PVDF |
Color |
RAL K7 COLOR CARD |
Coil ID |
508mm/610mm |
![Ral Color PPGL PE SMP PVDF Metal Building Material Color Coated Coils Bright Matt High Light Surface Filming Dx52D PPGI Z40 Prepainted Galvanized Steel Coil](//www.micstatic.com/athena/img/transparent.png) |
Coating thickness
We only produce high quality products and never cut corners. Aksu international brand paint is used, with uniform thickness, strong adhesion, and film error of plus or minus 5 μ M. No peeling, good corrosion resistance, uniform zinc layer thickness, strong adhesion. No peeling, good corrosion resistance, no corrosion for 20 years, the surface is very smooth, clean, symmetrical and beautiful. |
![Ral Color PPGL PE SMP PVDF Metal Building Material Color Coated Coils Bright Matt High Light Surface Filming Dx52D PPGI Z40 Prepainted Galvanized Steel Coil](//www.micstatic.com/athena/img/transparent.png) |
Zhongcansteel introduces the advanced testing equipments and builds up a professional scientific research team, strictly control the quality on each steps of production. including inspection on raw materials entry, product's color analysis during production,T-bend test, impact test, salt-spray test, tensile test and packaging testing on exported products , which ensures its integrated performance such as corrosion resistance, coating stickiness etc and the safety of transportation. |
Q: Do you offer sample?
A: Yes,we provide free sample if available.But customers are required to pay the freight.
Q: What's the MOQ?
A: 25 Tons. Because a container needs at least 25 tons to fill.
Q: What's your delivery time?
A: 15-30 days after receive deposit.